
Project cargo · Machinery · Out of gauge
Project cargo and machinery, planned end to end
Excavators, generators, plant and anything else that does not fit in a box. We survey the move, choose the equipment and the route, arrange the permits and escorts, and supervise loading and lashing at both ends, under our own house bill of lading.
- Flat rack and open top
- Breakbulk and RoRo
- Heavy haul and permits
- Supervised lashing
The right equipment
Matched to the cargo, not the other way round
Every project starts with the dimensions and the weight. From there we specify the equipment that carries the piece safely at the best cost.
Open top
For cargo too tall for a standard container or loaded by crane from above, sealed with a tarpaulin.
Flat rack
No roof and no side walls, for machinery wider or taller than any container.
Breakbulk
Units too large for a flat rack, loaded piece by piece into the vessel.
RoRo
Wheeled and tracked machinery driven on and off the ship.
How a project moves
One plan from the factory floor to the site
The same team owns every stage, so the survey, the trucking, the booking and the paperwork all describe the same cargo.
- Step 1
Survey
Dimensions, weights, lifting points and photos of every piece, checked against the equipment and the route.
- Step 2
Plan
Equipment, vessel, port and route chosen, with the oversize permits and escorts arranged.
- Step 3
Pickup
Flatbed, lowboy or heavy haul from your facility to the port.
- Step 4
Loading and lashing
Lifting, loading and securing supervised, so the cargo sails as it was planned.
- Step 5
Documents
Our own house bill of lading, the AES export filing and the papers the destination asks for.
- Step 6
Destination
Discharge, clearance and delivery to site through our partners abroad.
Container guide
Which container fits your cargo?
Pick a container to see its inside measurements and what it suits best. Not sure? Send us the cargo details and we'll choose for you.
Typical figures. Exact measurements and payload vary by carrier and box.

US trucking
The road leg, planned with the sea leg
Oversized cargo is often hardest to move before it reaches the port. We book the flatbed, lowboy or heavy haul truck, arrange the state permits and escorts, and survey the route where the load calls for it.
The trucking is timed to the vessel, so the cargo reaches the terminal inside its receiving window and does not wait on the pier.
- Flatbed, lowboy and heavy haul
- Oversize permits and escorts
- Route surveys for the largest loads
Where it goes
Machinery to the lanes we know best
The Gulf
Plant and equipment to the UAE, Saudi Arabia and the wider Gulf, routed through Khor Fakkan, Fujairah, Sohar or Jeddah.
Middle EastAsia
Industrial machines, generators and parts to South, Southeast and East Asia, by sea or by air.
AsiaAustralia and beyond
Machinery cleaned and treated for biosecurity, and project cargo to 193+ countries.
Australia
Questions
Project cargo questions
Short answers to what shippers ask us about oversized and heavy cargo.
What counts as project cargo?
Flat rack or open top: which does my cargo need?
What do you need from me to price a project move?
Do you arrange the oversized trucking in the US?
Can machinery parts go by air?
Can you still ship heavy cargo to the Gulf with the Strait of Hormuz restricted?
Is there anything special about machinery to Australia?
Still have a question? Call (908) 440-0999 or email [email protected].
Get a quote
Moving machinery? Send us the dimensions.
Send the length, width, height and weight of each piece, with the pickup and delivery points. We come back with the equipment, the route and the price.
- Ocean, air, trucking and vehicles
- No obligation, no sign-up
- Cargo released within 60 minutes of payment